Below is a short list of recent projects completed in and around Puget Sound
Clicking on the Project title will change the description of the project providing more information.
Please look at the project list, galleries and feel free to play with our before and after sliders below (Go on, we know you want to)
Project Resume
- USS Ohio Berthing Mod
- Blast&Paint DWT Frame
- Lube Oil Piping Replace
- Watertight Doors Replace
- COTS Incinerator Replace
Customer: General Dynamics: Electric Boat
Person of Contact: Pamela Kellington
Period of Performance: 9/17 -12/30/17
Location: PSNS
Description: Interior Decking Install Only: Terrazzo,VCT
Person of Contact: Pamela Kellington
Period of Performance: 9/17 -12/30/17
Location: PSNS
Description: Interior Decking Install Only: Terrazzo,VCT
Customer: General Dynamics: Electric Boat
Person of Contact: Gil Bissette
Period of performance: 7/24/17-8/10/17
Location: Global Coatings Shop
Description: Blast and Paint DWT Frame
Person of Contact: Gil Bissette
Period of performance: 7/24/17-8/10/17
Location: Global Coatings Shop
Description: Blast and Paint DWT Frame
Customer: PCE:Propulsion Controls Engineering
Person of Contact: Charlie Forbes
Period of performance: 2/2/17-7/11/17
Location: PSNS Pier Bravo USS Stennis
Description: SP-3 and Feather Surrounding N&D. Paint to Match
Person of Contact: Charlie Forbes
Period of performance: 2/2/17-7/11/17
Location: PSNS Pier Bravo USS Stennis
Description: SP-3 and Feather Surrounding N&D. Paint to Match
Customer: PCE: Propulsion Controls Engineering
Person of Contact: Charlie Forbes
Period of performance: 6/7/17-7/27/17
Location: PSNS Pier Bravo USS Stennis
Description: Blast SP-10 and Powder Coat (3) Watertight Doors @ Global Coatings Shop
Person of Contact: Charlie Forbes
Period of performance: 6/7/17-7/27/17
Location: PSNS Pier Bravo USS Stennis
Description: Blast SP-10 and Powder Coat (3) Watertight Doors @ Global Coatings Shop
Customer: General Dynamics: NASSCO
Person of Contact: Paul Bourgeois
Period of performance: 2/16/17-8/16/17
Location: PSNS Pier Bravo USS Stennis
Description: N&D SP-11, SP-3 Feather Existing Coat to Match Ext. Hull, Incinerator Pipe Sheathing, Interior Compartment (s) BLKHD/OVRHD/ Decks
Person of Contact: Paul Bourgeois
Period of performance: 2/16/17-8/16/17
Location: PSNS Pier Bravo USS Stennis
Description: N&D SP-11, SP-3 Feather Existing Coat to Match Ext. Hull, Incinerator Pipe Sheathing, Interior Compartment (s) BLKHD/OVRHD/ Decks